Machine-assisted translation. Read the Chinese original.

Research Notes · Continuous Revision

Agent measurement: execution facts, task results and value

Clarify the denominator and evidence boundaries, and avoid confusing retry, call success, being used and business benefits into one number.

Author's Analysis · Content Date · Description of inclusion and citation

The problem of AgentMeasure research is very specific: how to describe what happened after the software is called by Agent and let others check the meaning of the number. It is still an open draft and realization project, not a measurement standard that has been adopted by the whole industry.

The same thing can't be mixed with denominators.

A demonstration example: the user requests to generate a report, the first attempt of the server fails, and the second attempt succeeds. If the two attempts do belong to the same logical operation, it should be recorded:

Target Bear fruit Denominator
attempts 2 Actual execution attempt
operations 1 Logical operation after de-weighting
attempt success 50% Successful attempts / All attempts
operation success 100% Successful operation / all operations

This is just an example of explaining semantics, not a production measurement result. If the log lacks the operation identification and cannot be reliably linked and retry, the grouping rules and unknown parts must be disclosed, and an exact operand cannot be forced together.

A measurement chain has multiple breakpoints.

In "Available → Displayed → Selected → Execution → Useful → Incremental Value", each arrow requires evidence. The server log is good at describing the execution, and may not know what alternatives the Agent has seen; the client selection record may not know whether the end user accepts the result.

The measurement report should write the observable range first, and then give the index. If the denominator is not displayed, the selection rate will not be reported; if there is no user acceptance, HTTP success will not be ecased with task success; if there is no comparison, the before and after growth will not be written as causal benefits.

How to read the evidence of the current project

Public trace caseIt is used to check adaptation, field and counting boundaries. It comes from demonstration data and cannot replace the production traffic of real customers.

LabProvide pre-registration, experimental organization and reporting tools. The accompanying synthetic experiment is used to verify whether the engine can restore the known effect, and it can also report the results of no effect; it does not mean that the real Agent has been upgraded in the same way.

This restriction should appear near the result and should not be hidden at the end of the article.

Another contract is also required for billing.

The business can be charged according to the attempt, successful operation, time or result, but it needs to define in advance how to handle failure, retry, cancellation, timeout and manual takeover. Accurate measurement does not mean reasonable price; receiving payment does not mean creating incremental value.

I will verify the next stage of the operations that cannot be grouped in the real log, the final results that have not been returned, and the incomparable success between different tools. A measurement system that makes the original numbers less beautiful but easier to check is still valuable.

Public source and scope of application

  • AgentMeasure Core Specification

    The author's project specification · attempt, operation and evidence semantics; the draft is not generally adopted by the industry.

  • AgentMeasure · Langfuse demo traces

    Public demonstration data case · The adaptation and review of public demo trace does not represent production flow or causal return.

  • AgentMeasure Lab

    Author's project experimental tool · Experimental engine and synthesis example; synthetic uplift is not pushed out to the real Agent upgrade.